I arrived at 1:45 pm, contractor was still drilling hole. They switched bits and the air would not come through. They was able to get 4 feet, talked with Randy and he was good with not going the other foot.
I did my test and found no voids in the rock.
Contractor will clean up footing and start tying steel to pour footing for Bent 2
No comments:
Post a Comment