Contractor had drilled hole and was waiting on me when I arrived at 11:45, called for me to be there at noon.
I checked rock and did my test, rock looked good and found no voids in the test hole.
Contractor will try to be ready to pour on Thursday afternoon.
3827 Taney Co Bridge Victor Church Rd
Tuesday, April 24, 2018
Thursday, April 19, 2018
Site visit, Pour Bent 2 Footing
Contractor was ready to pour Bent 2 footing when Nick arrived, Concrete arrived and he tested it, Air :5.0%, Slump :4" and Temp : 64°. He made three cylinders
Pour went good.
Wednesday, April 11, 2018
Site visit, Check rock for Bent 2
I arrived at 1:45 pm, contractor was still drilling hole. They switched bits and the air would not come through. They was able to get 4 feet, talked with Randy and he was good with not going the other foot.
I did my test and found no voids in the rock.
Contractor will clean up footing and start tying steel to pour footing for Bent 2
I did my test and found no voids in the rock.
Contractor will clean up footing and start tying steel to pour footing for Bent 2
Subscribe to:
Comments (Atom)